A global consultancy business serving clients in the real estate, infrastructure and natural resources sectors.
Senior Construction Scheduler – Aviation
Location
United States
Posted
6 hours ago
Salary
$140K - $200K / year
Seniority
Senior
Job Description
Senior Construction Scheduler – Aviation
Turner & Townsend
• Develop, monitor and update owners' Project Integrated Master Schedule (IMS) • Establish the schedule management program and deliverables to be used on large scale capital programs • Interface with project stakeholders as trusted advisors to provide guidance and recommendations for the project • Prepare baseline schedules and schedule basis documents for approval by project teams • Conduct schedule of resource loading and leveling • Consolidate contractors schedule to incorporate into IMS • Assess impacts on the critical path and near-critical activities and report to the project team • Monitor schedule deviations and variances and assist in the development of alternative methods for corrective action • Apply EVM methodology to measure project progress • Review schedules with project team members on a regular basis to ensure that accurate and timely data is incorporated into the schedule • Prepare and provide schedule progress reports, trending charts, and schedule analysis on a periodic basis • Maintain record of scope changes, trends and variances that potentially affect schedule performance • Assure the credibility of the information contained in the schedule • Maintain liaison with clients and other consultants at all projects stages
Job Requirements
- Bachelor’s degree in construction management, cost management, quantity surveying, engineering or field related to construction
- Minimum 5-7 years of applicable experience
- Direct experience working on teams within a complex matrix environment
- Expertise using Primavera P6
Benefits
- Flexible working environment
- Health insurance
- Paid time off
- Professional development opportunities
Related Guides
Related Categories
Related Job Pages
More General Jobs
Quality Improvement Advisor II
Mountain-Pacific Quality HealthPartnering within our communities to provide solutions for better health
• Be the client’s primary point of contact for all activities including organizational communication, contract management, and dispute resolution • Ensure client expectations are met with a high degree of customer satisfaction • Meet internal and external metrics associated with assigned contracts
Programmatic Media Strategist – DV360 Focus
Scale Army CareersRemote hiring done right. Real jobs, vetted by real experts—for candidates who want to grow their careers.
• Own the setup, structure, execution, and optimization of DV360 campaigns. • Develop audience targeting strategies and campaign architecture. • Configure campaign trafficking, tagging, and measurement. • Monitor pacing, delivery, frequency, and campaign performance. • Troubleshoot existing DV360 implementations and optimize workflows. • Recommend programmatic best practices and optimization strategies. • Support ad trafficking across paid social platforms when required. • Maintain consistent campaign setup standards across channels. • Assist with cross-channel execution and campaign alignment. • Collaborate with internal teams to support campaign delivery. • Develop documentation, recommendations, and implementation guides. • Serve as the internal expert for DV360 strategy and execution. • Translate complex programmatic concepts into actionable recommendations. • Support internal training and knowledge sharing across the agency.
• Manage an assigned panel of 400-450 patients and conduct required monthly outreach to ensure continuity of care. • Conduct 50-60 daily outbound calls to patients, providing care plan support and health coaching aligned to their specific needs. • Maintain call quality standards through consistent engagement and professional communication in every patient interaction. • Collaborate with clinical teams, providers, and caregivers to identify and address clinical and social needs. • Support care coordination goals by staying on schedule with monthly outreach targets. • Close gaps in patient care through Chronic Care Management, Behavioral Health Integration, and Remote Physiological Monitoring services. • Advocate for patient needs by actively listening to concerns, investigating issues, and communicating solutions to the patient’s care circle. • Document all patient interactions in real time using the care coordination platform. • Maintain HIPAA compliance in all patient communications and documentation.
• Manage, design, and perform QA/QC checks related to technical activities • Development of Protective Relay Settings using AcSELerator Quickset and/or GE Enervista • Conduct P&C studies including short circuit analysis, relay coordination, and load flow • Review junior engineer’s designs, verify they meet client standards and specifications • Document QA/QC reviews, maintain record documents, and communicate information to the team • Mentoring and managing staff at all levels • Managing tasks on multiple projects in accordance with GAI’s high standards of project management




