Worldwide Mission Critical logo
Worldwide Mission Critical

Great People Delivering Great Projects

MEP Estimator – Data Center Construction

Location

United States

Posted

14 days ago

Salary

0

Seniority

Senior

Bachelor Degree4 yrs expEnglish

Job Description

MEP Estimator – Data Center Construction

Worldwide Mission Critical

• Conduct regionally-specific market research on mechanical, electrical, and plumbing systems • Maintain detailed records of historical project costs, including labor, materials, and equipment • Analyze historical data to identify trends, patterns, and opportunities for cost optimization • Develop conceptual budgets for MEP scope elements based on market analysis and project scope • Prepare detailed estimates for labor, materials, and equipment • Generate cost variance reports at major design milestones • Solicit and analyze subcontractor, vendor, and OEM pricing for electrical distribution, generators, switchgear, UPS, mechanical cooling systems, plumbing, fire protection, fire alarm, BMS/controls, and low-voltage/security systems • Collaborate with general contractors and trade-partners to reconcile project costs and ensure scope alignment • Conduct thorough constructability reviews focused on mechanical, electrical, plumbing, and low-voltage scopes • Assist in developing comprehensive RFP documentation for mechanical, electrical, plumbing, fire protection, and low-voltage/security scopes • Draft specific language for RFPs to ensure precise scope definitions and requirements • Support the coordination and conduction of site walks focused on relevant elements • Perform bid leveling for bids to compare and normalize proposals.

Job Requirements

  • 4+ years of estimating experience with a strong emphasis on mechanical, electrical, plumbing, and low-voltage scopes in mission-critical, data center, or other heavy industrial projects
  • Proven ability to estimate projects $50M+ in total construction value
  • Ability to perform quantity takeoffs for MEP systems, including electrical distribution and conduit/feeders, generators and switchgear, mechanical cooling and air handling, piping and plumbing, fire protection, fire alarm, BMS/controls, and structured cabling/low-voltage
  • Proficiency with estimating software (Destini, RIB CostX, WinEst, or similar) and Microsoft Excel
  • Solid understanding of data center-specific challenges, including critical power and cooling topologies, redundancy concepts, and the ability to read and interpret MEP drawings, single-line diagrams, and specifications
  • Familiarity with electrical and mechanical equipment lead times and procurement strategy for long-lead items such as generators, switchgear, transformers, and UPS systems
  • Ability to work independently in a fast-paced environment while collaborating with the estimating team.

Benefits

  • Health insurance
  • 401(k) matching
  • Paid time off
  • Flexible work arrangements
  • Professional development opportunities

Related Job Pages

More Construction Estimator Jobs

Turner & Townsend logo

Senior Low Voltage Estimator – Data Center Construction

Turner & Townsend

A global consultancy business serving clients in the real estate, infrastructure and natural resources sectors.

Full TimeRemoteTeam 10,001+H1B No Sponsor

• Provide estimate and cost planning to include producing and presenting the final cost plan. • Ability to estimate at conceptual, programming and detailed level. • Assist on feasibility studies and writing procurement reports. • Perform all aspects of procurement, including managing the pre-qualification stage, produce bid list, bid analysis, produce bid report, and compile contractual documents. • Participate effectively with post contract cost variances and the change control processes, where applicable refer major changes to line manager. • Manage cost checks and carry out valuations on larger projects, and ensure timely and accurate cost checking, and valuation process. • Produce monthly post contract cost reports and present to client. • Provide input into value engineering; negotiate and approve final accounts. • Maintain liaison with client and other consultants at all projects stages. • Provide leadership to cost management team, when necessary, ensure the delivery on all of accountabilities. • Identify opportunities to develop new business with existing clients and report such opportunities to appropriate line manager and utilize marketing database. • Identify improvements for cost management procedures, templates, and products, and refer ideas to leadership.

California
$130K - $160K / year