Ulteig describes itself as a leader in the engineering industry, working in partnership with organizations that build, maintain, and revitalize infrastructure a
Senior Project Controls Specialist – Scheduler
Location
United States
Posted
4 days ago
Salary
$111.2K - $150.4K / year
Seniority
Senior
Job Description
Senior Project Controls Specialist – Scheduler
Ulteig
• Lead development, monitor, and update project schedules so that projects can be executed in the most efficient manner possible • Manage numerous project schedules evaluating critical path, schedule content, relationships and logic, constraints, and milestones • Assess impacts to the schedule critical path activities; report deviations and variances and assist in the developing action plans for corrective measures • Track scope changes, trends and variances that potentially affect schedule performance • Document and track project meeting actions as directed • Establish and maintain effective working relationships with client and project team
Job Requirements
- Bachelor’s Degree required
- Minimum 10 years of project scheduling management experience in the utility, energy, construction, or engineering field required
- Project Management Professional (PMP) or PMI Scheduling Professional (PMI-SP) certifications desired
- Experience using Primavera P6 is required
- Must have strong written and verbal communication skills with the ability to effectively communication with project management and client’s leadership
- Proven experience in Microsoft Software Applications (Word, Excel, and PowerPoint)
Benefits
- Flexible Workplace
- Employee Ownership
- Competitive Pay
- Comprehensive Benefits Package
- Collaborative Environment
- Innovative Culture
Related Guides
Related Job Pages
More Project Scheduler Jobs
• Develop and maintain detailed schedules for transmission and substation projects using Primavera P6. • Collaborate across teams to validate schedule accuracy and drive alignment with strategic goals. • Perform critical path analysis, resource loading, and forecasting to proactively identify risks and optimize timelines. • Monitor project progress, flag potential delays, and lead the development of recovery plans.

